Developers eye South Shields street for new shared house – and it'll have dedicated manager to prevent crime
Plans for a new five-bedroom house in multiple occupation (HMO) in South Shields have been submitted to council development bosses.
South Tyneside Council’s planning department has received an application for 33-35 Vine Street in the town’s Biddick and All Saints ward.
Plans from Sterling Cambridge Ltd are seeking permission to convert the site from a residential dwelling planning class to a “five-person HMO.”


Proposals include living, kitchen and dining space and two en-suite bedrooms on the ground floor, as well as two en-suite bedrooms on the first floor and one bedroom with an off-suite.
The application falls against a backdrop of South Tyneside Council’s recent decision to launch an “immediate” borough-wide Article 4 Direction removing permitted development rights for small HMOs, meaning that planning permission is now needed for all HMOs across the borough.
In recent weeks, increasing numbers of HMO applications have been submitted to the council’s planning department for smaller developments of up to six bedrooms.
A planning application from developers notes that work already started at 33-35 Vine Street in June, 2025, but has not been completed.
A planning statement submitted with the HMO application notes there will be “no external works other than the addition of a bin store and cycle spaces”.
Internally, plans include the “reconfiguration of the existing layout to facilitate the conversion” and it was noted that “all habitable spaces will benefit from a generous provision of natural light, ensuring a quality internal living environment”.
The planning statement adds: “All the properties developed by Beaumont and Partners [the listed agent for the scheme] will be professionally designed and managed.
“We pride ourselves in producing high quality co-living spaces which are ‘aimed’ at young working professionals.
“Ensuring the occupants are of a high quality is as important to us as our neighbours.
“The properties are owned by Beaumont and Partners and/or its clients and thus high- quality respectful tenants are essential to the long-term commercial success of the investment.
“Every property has a dedicated property manager with a set of guidelines.”
It was noted that a property manager will “ensure that the HMO is managed appropriately” with actions around preventing antisocial behaviour, “ensuring that any necessary repairs are carried out promptly”, maintaining the property, providing access for regular inspections, and “ensuring that the water supply and drainage system serving the HMO is maintained and in good, clean and working condition”, planning documents state.
Those behind the scheme said the “level of interior fit out of the properties is of a high standard to attract the required level of professional tenant”.
The planning statement adds: “The proposed change of use from a C3 dwelling to a C4 HMO of multiple occupancy has been designed to meet all relevant standards and guidance set out by South Tyneside Council and national planning policy.
“The internal layout provides an appropriate standard of accommodation, exceeding the minimum space and daylight requirements, and includes adequate waste storage and cycle parking facilities in accordance with local HMO standards.
“The site is sustainably located within close proximity to […] local bus routes, shops, and public open spaces, ensuring convenient access to essential amenities and sustainable transport links.
“The proposal will therefore make an efficient use of existing housing stock, providing additional, high-quality accommodation that supports local housing needs without adversely impacting the character of the area or the amenities of neighbouring occupiers.”
It was also argued that the HMO could be “easily absorbed into the neighbourhood” and that “given the minimal change in the bedrooms […] the comings and goings of five tenants will not be significantly greater than those of a family unit.”
A decision on the planning application is expected following a council consultation exercise.
Comments can be made on the plan, via South Tyneside Council’s planning portal website, until January 16, 2026.
For more information on the plan, or to track its progress, visit South Tyneside Council’s planning portal website and search reference: 250775
For the latest public notices from your area, please visit: https://publicnoticeportal.uk/